Wilderdog

Pacific Blue Reflective Long Lead - 30ft

Pacific Blue Reflective Long Lead - 30ft - Main image
$32.16 $48 In stock

Category: 繩索牽繩與項圈

還在訓練狗狗喚回嗎?拿一條30英尺的牽繩,讓狗狗有空間自由活動,同時確保牠的安全。我們的長牽繩也非常適合露營時作為固定繩使用。(*但不要讓狗狗在固定繩上無人看管!)

  • 長度:30英尺
  • 由緊密編織的聚丙烯/聚酯纖維5/16英寸繩索製成
  • 編織有反光絲線,適用於低光或無光環境
  • 鋁製登山扣旋轉並鎖定
    • 登山扣寬度:1.5英寸
    • 登山扣長度:2.5英寸
    • 額定承重3 kN
  • 適合所有犬隻

Customer Reviews (5.0 / 5 · 5 reviews)

Kevin ★★★★★

Bought this for camping trips and it's become the go-to tie-out for our lab mix. The rope has a nice weight to it so it doesn't tangle into knots the way our old flat lead did, and the reflective weave actually shows up in the flashlight beam at night.

Jason H. ★★★★★

The 30ft length is perfect for letting my pup sniff around the campsite without me hovering. Rope feels sturdy and the reflective weave actually shows up when my headlamp hits it at dusk.

Scarlett ★★★★★

Took my border collie to the open field with this and finally stopped worrying about her bolting. The 30 feet gives her real room to sprint while I keep hold of the rope, and the reflective weave is a nice bonus for dusk walks. Only gripe is it takes a minute to coil back up without tangling.