Wilderdog

Pacific Blue Reflective Long Lead - 30ft

Pacific Blue Reflective Long Lead - 30ft - Main image
$32.16 $48 In stock

Category: Rope Leashes + Collars

Still working on your recall? Grab a 30 foot rope leash to give your dog room to roam, while still keeping him safe. Our long lead is also great to use as a tie-out while camping. (*But don't leave dogs unattended on a tie-out!) 

  • Length: 30 ft
  • Made with tightly spun, polypropylene/polyester ⁵⁄₁₆ in rope
  • Woven with reflective strands for use in low or no light conditions
  • Aluminum carabiner swivels and locks
    • Carabiner width: 1.5 in
    • Carabiner length: 2.5 in
    • Rated for 3 kN
  • Suitable for all dogs
Before you pay

Check the method and total at checkout.

When it ships

Allow for processing time as well as the journey to you.

Standard Shipping: Handling (business days) 0–1; Transit (business days) 7–15.

Express Shipping: Handling (business days) 0–1; Transit (business days) 7–15.

View policy
If you need a refund

Keep your order number and contact the store to start.

Please contact us for the refund processing timeframe before returning an item.

View policy
Delivery costs

Review the cost for your destination and chosen service.

Standard Shipping · United States: $0.00

Express Shipping · United States: $3.99

View policy
Returning an item

Check the return conditions before sending anything back.

United States · Return window (days after delivery): 30. Return method: By mail. Return postage: Seller pays.

View policy

Customer Reviews (5.0 / 5 · 5 reviews)

Kevin ★★★★★

Bought this for camping trips and it's become the go-to tie-out for our lab mix. The rope has a nice weight to it so it doesn't tangle into knots the way our old flat lead did, and the reflective weave actually shows up in the flashlight beam at night.

Jason H. ★★★★★

The 30ft length is perfect for letting my pup sniff around the campsite without me hovering. Rope feels sturdy and the reflective weave actually shows up when my headlamp hits it at dusk.

Scarlett ★★★★★

Took my border collie to the open field with this and finally stopped worrying about her bolting. The 30 feet gives her real room to sprint while I keep hold of the rope, and the reflective weave is a nice bonus for dusk walks. Only gripe is it takes a minute to coil back up without tangling.